Suchergebnis

D 135 CO2 particle blasting of moulds in an aluminium casting factory ( Date: )
Aluminium cast moulds made of steel are cleaned from cast residue by roboter operated CO2 dry ice particle blasting; thereafter continued use of the moulds
 


  Material  |  Dirt  |  Equipment  |  Agents  |  Process  |  Costs  |  Evaluate  |  Comparison  


 

Designation(Short)

D 135 CO2 particle blasting of moulds in an aluminium casting factory

 

Aluminium cast moulds made of steel are cleaned from cast residue by roboter operated CO2 dry ice particle blasting; thereafter continued use of the moulds

 

Technology:

good
Utilisation of equipment (throughput,workload) in %: 56,00
Maximum possible throughput of parts per year: 70.080
Actual throughput in number of parts annually / Parts per year: 39.245
Max. area which can be cleaned per year: No statement
Cleaned area per year: No statement
Size of equipment:
Type of cleaning: Closed camera blasting, Automated blasting, Dry CO2 ice blasting
Steps: 1
Auxiliary equipment: No statement from company
Qualification level of personnel: No statement
Evaluation by company personnel(Technical equipment): good

Quality:

very good
Quality of cleaning: good
Rating:
Further treatment: Repair, maintenance, Continued operation/application
Surface requirements: Free of dirt and oxide film, free of incrustations and burn in soil
Special quality criteria of the company:
Quick tests: Visual control
Advanced tests:

OSH:

good

Cleaningstep:

1 (Cleaning)

Cleanertype:CO2 dry iceCarbondioxide
Safety re acute health:very good
Safety re chronic health:very good
Safety re fire/explosion:very good
Standards:
Met noise norm: Yes
Safety re procedure: good

Environment:

Cleaningstep:

1 (Cleaning)

Safety re environment:very good
Safety re exposure potential:very good
Treatment of waste:good

Consumption (electric power) kWh :

0,00

Consumption(other energy) kWh:

0,00

Consumption(water) m:

0,00

Amount of waste water m:

0,00

Costs:

good
Total costs per annum (EURO) : 417,00
Total costs per unit (EURO) : 0,01
Total costs per m (EURO) :
Total costs per removed dirt (EURO / kg) :
Annual equipment costs (EURO) :
Operational costs
Labour (EURO) :
Energy (EURO) :
Water (EURO) :
Waste management (EURO) :
Waste water (EURO) :
Maintenance (EURO) :
Agents (EURO) : 34,00