deutsch | english | franšais | espa˝ol
Search result / Suchergebnis

D 133 CO2 Snow blasting of relays ( Date: 2008-02-19 )
Relay arrays are cleaned for restauration and maintenaince from dust by manually operated CO2 dry ice snow blasting; thereafter continued operation.
  Additional Info


  Material  |  Dirt  |  Equipment  |  Agents  |  Process  |  Costs  |  Evaluate  |  Comparison  


Material:

Relay contacts, relay arrays are assembled in cabinet
  alloy
Weight : Part is not moved
Dim : Longest dimension 10 mm to 100 mm
  smooth surfaces
Utilisation of equipment (throughput,workload) in % : No statement
Maximum possible throughput of parts per year : No statement
Actual throughput in number of parts annually / Year : No statement
Max. area which can be cleaned per year : No statement
Cleaned area per year : No statement
Parts are cleaned on site : Yes

Ads:    Adverts      Adverts